The CRSI Design Checklist Suite is a collection of 13 specialized checklists developed by the Concrete Reinforcing Steel Institute to ensure compliance with the ACI 318-19 Building Code. These tools are designed to streamline the design and detailing of steel-reinforced concrete structural members, ensuring no code-prescribed requirements are overlooked during calculations or document verification. Core Components of the Checklist Suite
The checklists are typically organized into logical bundles based on the structural members they cover:
Horizontal Members: Includes checklists for Beams, Diaphragms, Flat Plate Systems, and One-way Slabs. Vertical Members: Covers Columns, Joints, and Walls. Specialized Systems: Foundations: Both Deep and Shallow foundation systems.
Seismic Members: Focused on Intermediate Moment Frames and Special Moment Frames. Key Features and Tools crsi design checklist pdf repack
Code Verification: Each list includes ACI 318-19 section numbers and auxiliary information to aid in the correct interpretation of requirements.
Excel Calculators: Complimentary Excel spreadsheets are provided with the checklists to expedite checking procedures, such as generating column interaction diagrams or verifying beam capacity.
Design Procedures: Beyond checking, they can serve as step-by-step design procedures for professionals less familiar with code revisions. How to Access the Checklist The CRSI Design Checklist Suite is a collection
The checklists are official CRSI publications and are generally available as paid resources:
Step 4 – Peer Review
Send the repack to a junior engineer as a training tool. Ask them to check your drawings against the repack’s “Detailing” section. This catches errors like missing seismic hooks or insufficient lap splices.
4. Target Audience
- Structural Engineers (EITs & PEs): For design phase self-checks.
- BIM/CAD Detailers: To ensure shop drawings meet physical constraints.
- Field Inspectors: For quick verification of rebar placement against the design intent.
Frequently Asked Questions
Step 3 – Detailed Design
Keep the repack open on a second monitor. As you finish each member (beam, column, slab), run through the applicable checklist items. Mark items as “Pass,” “Fail,” or “N/A” using PDF annotation tools. Structural Engineers (EITs & PEs): For design phase
Step 2 – Schematic Design
Use the "Load Combinations" section to verify that your analysis software inputs match code-prescribed factors.
2. Concrete Cover Checklist (Fire & Durability)
A well-organized repack will merge exposure classes (C0, C1, C2) with fire ratings (1hr to 4hr). This section should include:
- Slabs: ¾" to 2" cover based on aggregate exposure.
- Beams: 1½" for interior; 2" for exterior.
- Columns: 1½" for #5 ties and smaller; 2" for larger bars.