Gunnebo Speedstile Fl Installation Manual May 2026
The Gunnebo SpeedStile FL installation manual provides comprehensive instructions for the physical setup, site preparation, and initial powering of these security barriers. Key procedures include aligning the units, preparing the floor with specific bolting depths, and performing a manual check before connecting electronics. Site Preparation & Foundation
Floor Requirements: The installation surface must be flat and level to within ±5plus or minus 5 mm over the entire footprint.
Concrete Specifications: The foundation should have at least resistance.
Foundation Dimensions: Minimum concrete base dimensions are typically deep, depending on the cabinet length.
Conduits: Any horizontal pipe or conduit running below the unit must be at least below the Finished Floor Level (FFL) and rise at least from the foundation. Physical Installation Steps
Alignment: Mark a chalk line on the ground to ensure units are perfectly parallel and correctly aligned, which is critical for proper operation.
Positioning: Place units in their required positions and mark the fixing holes on the floor.
Anchoring: Move units to drill anchor holes (minimum bolting depth of ) and then re-position to anchor them firmly.
Leveling: Use shims to ensure the frame is perfectly level in both transverse and longitudinal directions. Pre-Powering Checks gunnebo speedstile fl installation manual
Before powering the electronics for the first time, follow these safety notes:
Disconnect Components: Temporarily disconnect the motors, battery, and brakes from the MB01 board.
Manual Test: Manually rotate the doors to ensure they move smoothly with low oscillation.
Safety Precaution: Ensure all electrical power supplies are OFF before working on equipment to avoid injury or equipment damage. Electronic Integration
Control Board: Settings are typically programmable via digital parameters; most units use a platform with in-built RS485 and COMR1 switching interfaces.
Reader Integration: The units are designed for easy integration with most third-party card readers, which can be mounted on or within the lid.
For detailed technical diagrams or specific programming codes, you can reference the full Installation Operation and Maintenance Manual (Siel Invest) or the SpeedStile FL Datasheet (Yumpu).
Installation O peration and Maintenance Manual - Siel Invest The installation site is level and structurally sound
Installation of the Gunnebo SpeedStile FL requires a level, 150mm deep concrete foundation (minimum 30N/mm²) with precise alignment within +/- 5mm. Key steps include secure anchoring, proper conduit placement 140mm below the floor, and integration of access control via SG1 cards. For complete technical specifications and installation diagrams, review the Siel Invest manual. Gunnebo SpeedStile FLS Installation Guide | PDF - Scribd
Feature: Gunnebo SpeedStile FL Installation Manual
Introduction
The Gunnebo SpeedStile FL is a high-speed, bi-directional pedestrian gate designed for secure and efficient access control. Proper installation of the SpeedStile FL is crucial to ensure optimal performance, reliability, and safety. This feature provides a comprehensive guide for installing the Gunnebo SpeedStile FL, including step-by-step instructions, technical specifications, and important safety considerations.
Pre-Installation Checklist
Before beginning the installation process, ensure that:
- The installation site is level and structurally sound.
- The area around the installation site is clear of obstacles and tripping hazards.
- The SpeedStile FL unit is properly unpacked and inspected for damage.
- All necessary tools and materials are available, including:
- Gunnebo SpeedStile FL installation kit
- Power supply and cabling
- Communication cables (if applicable)
- Mounting hardware (e.g., anchors, screws)
Installation Steps
- Unpacking and Preparation
- Carefully unpack the SpeedStile FL unit and inspect for damage.
- Remove any protective covering and debris.
- Ensure all components, including the gate arms, sensors, and control unit, are accounted for.
- Mounting the SpeedStile FL
- Position the SpeedStile FL unit on the prepared site, ensuring levelness and plumbness.
- Secure the unit to the floor using the provided mounting hardware.
- Connecting Power and Communication Cables
- Connect the power supply to the SpeedStile FL control unit.
- Connect any communication cables (e.g., RS485, TCP/IP) to the control unit.
- Configuring the SpeedStile FL
- Configure the SpeedStile FL settings, including:
- Gate arm settings (e.g., arm length, arm speed)
- Sensor settings (e.g., sensitivity, timer)
- Refer to the Gunnebo SpeedStile FL user manual for detailed configuration instructions.
- Configure the SpeedStile FL settings, including:
- Testing and Verification
- Test the SpeedStile FL to ensure proper operation, including:
- Gate arm movement and alignment
- Sensor detection and response
- Communication with access control systems (if applicable)
- Test the SpeedStile FL to ensure proper operation, including:
Technical Specifications
- Power supply: 100-240VAC, 50/60Hz
- Power consumption: 50W (max)
- Operating temperature: -20°C to +50°C (-4°F to +122°F)
- Humidity: 0-90% RH (non-condensing)
- Gate arm length: 600-1200mm (24-47in)
- Gate arm speed: 0.5-2.5m/s (1.6-8.2ft/s)
Safety Considerations
- Ensure the SpeedStile FL is installed in accordance with local regulations and standards.
- Ensure the installation site is well-lit and free from tripping hazards.
- Ensure the SpeedStile FL is properly maintained and serviced to prevent accidents.
Conclusion
The Gunnebo SpeedStile FL is a reliable and efficient pedestrian gate solution for secure access control. By following this installation manual, you can ensure a successful installation and optimal performance of the SpeedStile FL. If you have any questions or concerns, please consult the Gunnebo support team or a qualified installation professional.
Appendix
- Gunnebo SpeedStile FL dimensions and layout
- Wiring diagrams and connection details
- Troubleshooting guide
2.4 Sensor Calibration (The "Learning" Process)
After mechanical installation, the manual requires a sensor calibration routine.
- Power on the unit. The LEDs will flash amber.
- Enter the engineering menu via the small button on the main PCB (or via the LCD screen on newer models).
- Select "Sensor Auto-Tune" .
- Ensure no objects are in the lane. The unit will click and cycle the glass 3 times.
- Verification: Wave your hand through each of the 12 IR beams (6 per side). The diagnostic LED for each beam should toggle. Any beam that fails indicates a damaged sensor or misaligned pedestal.
🚪 The Gatekeeper’s Blueprint: A Field Guide to Installing the Gunnebo SpeedStile FL
Welcome, installer.
You’re not just bolting down a lane. You’re building the first line of defense for an office, stadium, or transit hub. The SpeedStile FL is sleek, fast, and unyielding—but only if you install it right. Let’s get that glass wing moving like it means it.
6. Commissioning and Configuration
Once mechanical and electrical setup is complete, the unit must be configured via the control board (often a Gunnebo proprietary board or an industrial PLC).
- Power Up: Switch on the mains power. The system will typically perform a self-test (opening and closing flaps) to find the home position.
- Sensor Calibration: Check that all safety IR beams are functioning. If the beam is broken, the flaps should stop or reverse to prevent injury.
- Access Control Integration:
- The manual typically provides a wiring diagram for connecting Wiegand interface readers or other ID systems.
- Input signals (Dry Contact) from the Fire Alarm system must be tested. In a fire alarm state, the flaps should automatically open (Fail-Safe) to allow free egress.
- Testing: Perform a minimum of 20-30 entry and exit cycles to verify smooth operation and correct timing of the auto-close function.
