Leica Tcr805 Total Station User Manual Work May 2026
Leica TCR805 User Work Guide (Field Reference)
8. Care & Maintenance
- Cleaning: Blow dust off optics. Clean glass with a soft, lint‑free cloth and pure isopropyl alcohol. Never use abrasive materials.
- Storage: Keep in dry environment (15–25°C, 40–60% RH). Remove battery for long‑term storage.
- Calibration: Annually return to Leica authorized service center for axis error (tilt, collimation, trunnion) check.
Key Features (short)
- Dual-axis compensator for plumbed accuracy
- EDM range suitable for common site distances (reflector and reflectorless modes)
- High-contrast display and simple keypad workflow
- Bluetooth/serial data transfer to controllers
- Battery swap for extended field sessions
Chapter 3: The Art of Reflectorless Measurement (TCR805’s Unique Feature)
Unlike older total stations, the TCR805 includes Power Reflectorless (RL) technology. This allows you to measure points without a prism—ideal for:
- Measuring building corners.
- Overhead utility lines.
- Danger zones (landslide areas, cliff faces).
However, the user manual dedicates a 10-page warning section to RL mode. Here is the distilled manual work you must follow: leica tcr805 total station user manual work
Step 1: Unpacking and Battery Check
- Inspect the carrying case for impact damage.
- Insert the GEB111 battery. The manual requires a full charge cycle (12 hours) before first use.
- Action: Press the
ONbutton. If the display shows "Battery Low," do not proceed.
Conclusion
The Leica TCR805 is a capable total station for demanding surveying and layout tasks. Following the user manual procedures for setup, configuration, measurement routines, data management, and routine checks will keep measurements accurate and workflows efficient. Regular maintenance, backups, and verification measurements are essential to reliable results on every job. Leica TCR805 User Work Guide (Field Reference) 8
If you want, I can:
- Produce a downloadable checklist for daily setup and verification.
- Write a step-by-step stakeout tutorial tailored to a construction site (metric or imperial).
- Create printable point-coding conventions for field crews.
(Invoking related search terms for further exploration.) Cleaning: Blow dust off optics